The Flood Committee discussed the Offshore Breakwater Project, 7th Street Pump Project, and Green Infrastructure Design. The committee reviewed materials and updates on each project, and approved the design recommendations for the Offshore Breakwater Project. The committee also discussed the preparation of a permitting package and the application for grants to fund the projects.
Details
Summary
The Flood Committee discussed the Offshore Breakwater Project, 7th Street Pump Project, and Green Infrastructure Design. The committee reviewed materials and updates on each project, and approved the design recommendations for the Offshore Breakwater Project. The committee also discussed the preparation of a permitting package and the application for grants to fund the projects.