The City Council work session was held on March 24, 2026, and covered a utility rate study and financial analysis for infrastructure renewal planning. The discussion focused on a 10-year period through 2035, with findings indicating a funding gap in the water utility. The council consensus preferred maintaining the current rate structure with proportional increases. The work session was adjourned at 6:51 p.m.
Details
Summary
The City Council work session was held on March 24, 2026, and covered a utility rate study and financial analysis for infrastructure renewal planning. The discussion focused on a 10-year period through 2035, with findings indicating a funding gap in the water utility. The council consensus preferred maintaining the current rate structure with proportional increases. The work session was adjourned at 6:51 p.m.