[PAGE 1] Planning Commission City Attorney Ashley Bertussi, Chairperson Elizabeth Martyn Jeffrey Chan, Vice-Chairperson Sergio Lopez, Commissioner Commission Secretary Andy Alvarez, Commissioner Angel Hernandez Aaron Popejoy, Commissioner Jorge A. Perez, Commissioner http://cityofelcentro.org/ Armando Muñoz, Commissioner AGENDA CITY OF EL CENTRO PLANNING COMMISSION City Hall Council Chambers 1275 Main Street El Centro, CA 92243 TUESDAY, DECEMBER 9, 2025 AT 5:30 PM Any member of the public attending in person and wishing to make a comment is asked to complete a speaker slip and follow the “Notice to the Public” instructions below. Alternatively, any member of the public is invited to submit public comments in advance of the meeting to be answered at the meeting. Please email your questions to ecplanning@cityofelcentro.org or call (760) 337-4545. The public may participate and make public comments via the following Zoom link: https://us06web.zoom.us/j/88123461709?pwd=N53pqPhBGO1nOKasS5iafzYxOP88ix.1 Optional dial-in number: 1-669-900-6833 Meeting ID: 881 2346 1709 Passcode:195382 Page 1 of 37 [PAGE 2] Public comments via zoom are subject to the same time limits as those in person. NOTICE TO THE PUBLIC This is a public meeting. If there is a matter on the agenda on which you wish to be heard, please come forward to the microphone; address yourself to the commission, stating your name and address for the record. Persons wishing to address the Commission are not required to identify themselves (Gov’t Code § 54953.3); however, this information assists the Chairperson by ensuring that all persons wishing to address the Commission are recognized and it assists the Commission’s Secretary in preparing meeting minutes. The Chairperson reserves the right to place a time limit on each person asking to be heard. If you wish to address the Commission concerning any other matter within the Commission's jurisdiction, you may do so during the public comment portion of the agenda. * Any information provided on the “Speaker Slip” is voluntary and will be public record. CALL TO ORDER: ROLL CALL CONSENT AGENDA Consent agenda items are approved by one motion. Commissioners or members of the public may pull consent items to be considered separately at a time determined by the Chairperson. 1. Approval of November 17, 2025, Planning Commission Minutes. PUBLIC HEARINGS 2. Conditional Use Permit 25-04 for La Plaza Bar Vivia Arellano applied for a Conditional Use Permit to operate a lounge bar within an existing building located at 669 W. Main Street (APN 053-104-002). The property is located in the CD-Downtown Commercial Zone which requires bars and nightclubs to obtain a CUP. The proposed establishment, to be named La Plaza Bar, would be expected to operate 7 days a week and will have a mixture of seating, games, and amenities. No expansion of the building footprint is proposed. Presentation: Valeria Landeros, Assistant Planner Recommendation: Open the public hearing and after allowing input from all proponents and opponents of the project move forward in approving the project and issuing conditional use permit. NEW BUSINESS 3. Discussion and any necessary action regarding attendance at the Cal Cities Planning Commissioner's Academy NON-ACTION INFORMATION ITEMS 4. 2026 Planning Commission Meeting Calendar Page 2 of 37 [PAGE 3] 5. Community Development Department Report PUBLIC COMMENTS ADJOURNMENT Materials related to an item on this Agenda submitted to the Commission after distribution of the agenda packet will be available for public inspection at the Community Development Department-Planning & Zoning Division located at 1275 W. Main Street, El Centro, California during normal business hours. In compliance with the Americans with Disabilities Act, if you need special assistance to participate in this meeting, you should contact the Community Development Department- Planning & Zoning Division at (760) 337-4545. Notification of at least 72 hours prior to the meeting will enable the City to make reasonable arrangements to assure accessibility to this meeting. Page 3 of 37 [PAGE 4] PLANNING COMMISSION Item: 1. City Hall Meeting: 12/9/2025 5:30 PM 1275 W. Main Street CONSENT AGENDA El Centro, CA 92243 APPROVAL OF NOVEMBER 17, 2025, PLANNING COMMISSION MINUTES. STAFF REPORT - ACTION ITEM: Please review Planning Commission minutes for the Special Meeting on November 17, 2025. ATTACHMENTS: 1. 1 1.17.2025 Planning Commission Minutes Page 4 of 37 [PAGE 5] MINUTES OF THE PLANNING COMMISSION MONDAY, NOVEMBER 17, 2025 5:30 PM PLANNING COMMISSION JORGE A. PEREZ, CHAIRPERSON ASHLEY BERTUSSI, VICE-CHAIRPERSON SERGIO LOPEZ, COMMISSIONER ANDY ALVAREZ, COMMISSIONER AARON POPEJOY, COMMISSIONER JEFFREY CHAN, COMMISSIONER ARMANDO MUÑOZ, COMMISSIONER CALL TO ORDER: The El Centro Planning Commission convened in a regular session at City Hall Council Chambers, 1275 W. Main Street, El Centro, California at 5:30 PM. Chairperson Jorge A. Perez presided over the meeting. ROLL CALL PRESENT: Chairperson Jorge A. Perez Commissioner Aaron Popejoy Commissioner Andy Alvarez Commissioner Jeffrey Chan Commissioner Armando Muñoz ABSENT: Vice-Chairperson Ashley Bertussi Commissioner Sergio Lopez CITY STAFF: Community Development Director, Angel Hernandez City Attorney, Elizabeth Martyn Building Official, Frank Soto Building Inspector, Virgilio Anguiano Associate Planner, Andrea Montaño Assistant Planner, Valeria Landeros Staff Assistant, Poleth Lopez CONSENT AGENDA Consent agenda items are approved by one motion. Commissioners or members of the public may pull consent items to be considered separately at a time determined by t he Chairperson. Page 5 of 37 [PAGE 6] 1. Approval of October 14, 2025, Planning Commission Minutes Commissioner Popejoy moved to approve, seconded by Commissioner Alvarez. Voting Yes: Commissioner Alvarez, Chairperson Perez, Commissioner Popejoy, Commissioner Chan Voting No: None Abstaining: Commissioner Muñoz PUBLIC HEARINGS 2. Public Hearing to Consider Approving Conditional Use Permit (CUP 25-03) to O perate A Church at 401 W. Main Street (APN 053-114-009) Presentation: Andrea Montano, Associate Planner Recommendation: Motion to adopt Planning Commission Resolution No. 25-___ , recommending approval of Conditional Use 24-02. Associate Andrea Montaño presented a conditional use permit for The Potter's House Church to operate at 401 West Main Street in downtown El Centro. Staff recommended approval, noting the site's compliance with zoning regulations and existing parking capacity. The church plans to hold services twice on Sundays and once midweek, with an occupancy load of 40 people. Chairperson Perez moved to approve, seconded by Commissioner Alvarez. Voting Yes: Commissioner Alvarez, Chairperson Perez, Commissioner Popejoy, Commissioner Chan, Commissioner Muñoz Voting No: None Abstaining: None 3. P ublic Hearing to Consider Zoning Variance 25-01 at 2779 W. Main Street Presentation: Recommendation: Motion to adopt Planning Commission Resolution No. 25-___ , denying of Zoning Variance 25-01 Associate Planner, Andrea Montaño presented a zoning variance request for a corner cutback at 2779 West Main Street. Staff recommended denying the variance, citing concerns about visibility and public safety. The applicant presented photos to demonstrate that a wall would not obstruct visibility for drivers. Several neighbors expressed concerns about visibility and safety, particularly for pedestrians and cyclists. The Commission considered the fire hydrant's location and potential damage, but decided it was not a determining factor for granting the variance. Chairperson Perez moved to Deny, seconded by Commissioner Chan. Voting Yes: Chairperson Perez, Commissioner Chan, Commissioner Muñoz Voting No: Commissioner Alvarez, Commissioner Popejoy A bstaining: None Page 6 of 37 [PAGE 7] NEW BUSINESS 4. Discussion and any necessary action regarding appointment of the Planning Commission Chairperson to serve for the term ending November 2026. Commissioner Aaron Popejoy recommended and moved to appoint Vice-Chairperson, Ashley Bertussi, as the new Chairperson for the 2026 term. Chairperson Jorge A. Perez seconded the motion. Voting Yes: Commissioner Alvarez, Chairperson Perez, Commissioner Popejoy, Commissioner Chan, Commissioner Muñoz Voting No: None Abstaining: None 5. Discussion and any necessary action regarding appointment of the Planning Commission Vice-Chairperson to serve for the term ending November 2026. Commissioner Aaron Popejoy recommended and moved to appoint Commissioner, Jeffrey Chan, as the new Vice-Chairperson for the 2026 term. Chairperson Jorge A. Perez seconded the motion. Voting Yes: Commissioner Alvarez, Chairperson Perez, Commissioner Popejoy, Commissioner Chan, Commissioner Muñoz Voting No: None Abstaining: None NON-ACTION INFORMATION ITEMS 6. Community Development Department Report Community Development Director, Angel Hernandez updated the Planning Commission on the mobile vending regulations. PUBLIC COMMENTS No public comments were obtained. ADJOURNMENT The meeting was adjourned at 7:18 P.M. Page 7 of 37 [PAGE 8] PLANNING COMMISSION Item: 2 City Hall Meeting: 12/09/2025 5:30 PM 1275 W. Main Street Public Hearing El Centro, CA 92243 PUBLIC HEARING TO CONSIDER CONDITIONAL USE PERMIT 23-04 FOR LA PLAZA BAR AT 669 W. MAIN STREET Project: Conditional Use Permit 25-04 Location: 669 W. Main Street Property Owner/Applicant: Assessor’s Parcel Number: 053-104-002 Vivia Arellano Staff Planner: Zoning Designation: CD (Downtown Valeria Landeros, Assistant Planner Commercial) Proposed Use: Lounge Bar PROJECT SUMMARY The applicant Vivia Peraza is proposing to open La Plaza Bar, a lounge bar to be located in the Downtown Commercial zone at 669 W. Main Street also known as APN 053-104-002 (see Exhibit A – Project Location Map). Bars and nightclubs require a conditional use permit to operate within the Downtown Commercial zone, per El Centro Municipal Code Section 29-61. This bar is proposed to occupy approximately 2,290 square feet of the building at 669 W. Main Street. STAFF RECOMMENDATION: Open the public hearing and after allowing input from all proponents and opponents of the project move forward in approving the project and issuing conditional use permit. BACKGROUND PROJECT SITE The site is located on the south side of West Main Street between 6th and 7th Streets, in the Downtown El Centro area at 669 W. Main Street. The existing building was previously occupied by Twilight Smoke shop and has been vacant for over 7 years. The building is currently undergoing renovation and is served by City water and sewer. The floor plan identifies the main entrance along Main Street and emergency exits at the rear side of the building exiting into the alley. The building is connected to city water and sewer services and is currently under renovation to accommodate the proposed lounge bar. SURROUNDING AREA This site is surrounded by a mix of commercial uses including offices, retail stores, and restaurants, as well as civic uses such as public transportation, parking, and the town center. The surrounding zoning is a mix of CD (Downtown Commercial) consistent with Page 8 of 37 [PAGE 9] the project site’s zoning designation, and LU (Limited Use). Below is a table summarizing the abutting land uses and zoning designations. Direction Uses Zoning North Dance studio, tattoo parlor, mattress CD (Downtown Commercial) store, and a vacant building East Private parking lot and professional CD (Downtown Commercial) offices South Transit Terminal LU (Limited Use). West Restaurant (in the adjoining building), CD (Downtown Commercial) and Town Square & LU (Limited Use). BUSINESS OPERTATION The project proposes to utilize the front interior portion of the building, including a bar area, lounge seating, restrooms, a break room, a surveillance office, and a storage room, while a designated rear open-space area will remain unused for business operations and must stay unobstructed with a clearly delineated pathway for emergency access, as outlined in the resolution per Building Code requirements (see Exhibit E – Staff Comments & Exhibit F – Resolution). The applicant also intends to apply for Sidewalk Dining Permit and plans to utilize the portion of the sidewalk fronting their business for outdoor seating and a podium for security check. La Plaza Bar will operate seven days a week, with hours of 12:00 PM to 10:00 PM on Sundays, 12:00 PM to 11:00 PM Monday through Wednesday, and 12:00 PM to 12:00 AM Thursday through Saturday. Business operations include alcohol service, lounge seating, billiards, televisions for sports and entertainment, and occasional live music performances by local artists. No food service or kitchen facilities are proposed for this project. The applicant is currently applying for a Type 48 On-Sale General Public Premises ABC liquor license (see Exhibit D), which authorizes the sale and on-site consumption of alcohol and prohibits the entry of persons under 21 years of age; the operator will be required to post appropriate signage and conduct ID verification at the point of entry. ANALYSIS LAND USE AND ZONING COMPATIBILITY Per the El Centro Municipal Code, bars and night clubs are conditionally permitted uses within the Downtown Commercial (CD) Zone, subject to Planning Commission approval. The proposed use aligns with the Downtown Commercial land use designation, which encourages entertainment and hospitality uses that contribute to a vibrant and active downtown environment. The operation of La Plaza Bar will utilize an existing commercial space, promoting infill development and activation of an underutilized property. ACCESS, CIRCULATION, AND PARKING Page 9 of 37 [PAGE 10] The property is accessible from Main Street, a two-lane collector, and has rear access through a public alley. Downtown El Centro commercial properties are exempt from on- site parking requirements; patrons and employees will utilize nearby on-street parking and public lots within walking distance. The project is not anticipated to generate traffic volumes that would exceed the existing roadway capacity or require off-site improvements. PUBLIC SERVICES AND UTILITIES The property is connected to existing city water and sewer lines. The water and sewer capacity fees will be assessed based on increased usage compared to prior occupancy. The project site is also served by existing public safety, fire, and police services. Any additional requirements identified during departmental review—such as ADA compliance, backflow prevention, or encroachment permits—will be addressed as conditions of approval. NOISE AND SECURITY CONDITIONS Typical impacts from bar and lounge operations include noise and potential late-night disturbances. The project’s proximity to commercial and civic uses, rather than residential properties, minimizes these potential impacts. Security of patrons, workers, and other persons due to the operation of lounge bar has been reviewed. At minimum, the bar will require security personnel to be present during weekend operating hours and special events. Additionally, adequate outdoor lighting must be provided by the business to ensure safety and visibility in adjacent pedestrian areas as well as the rear alleyway, as a condition of approval as required by the Police Department. BUILDING CONDITIONS AND AESTHETICS The existing building is undergoing minor renovations and, if the CUP is approved tenant improvements will require building permits to move forward with the project. The open space area identified on the approved floor plan shall remain free of obstructions and not used for business operations or storage. The operator shall install visible floor tape or markings delineating the required pathway through the open space to ensure it remains open and unobstructed at all times for emergency access and safety compliance. Exterior enhancements may include repainting and maintenance to ensure consistency with the Downtown Commercial Design Standards. Any new signage will comply with Chapter 22.1 (“Signs”) of the El Centro City Code. The operator shall ensure that the building exterior, sidewalk frontage, and alley access are maintained in a clean and orderly condition. Trash and debris generated by business patrons or operations shall be removed daily, and any graffiti or vandalism shall be addressed within 72 hours of occurrence. PUBLIC NOTICING AND ENVIRONMENTAL REVIEW PUBLIC NOTICING A public hearing is scheduled before the Planning Commission on December 9, 2025 Page 10 of 37 [PAGE 11] and a public hearing notice was published in the Imperial Valley Press on Friday, November 28, 2025. Notices were also mailed to all property owners within 300 feet of the subject site and to all known occupants or business operators within that radius. As of the date of preparation of this staff report, staff have not received any communications or comments regarding the project. If approved by the Planning Commission, conditional use permit 25-04 will be issued to La Plaza Bar. ENVIRONMENTAL REVIEW The proposed project is exempt from the California Environmental Quality Act (CEQA) pursuant to Article 19, Section 15303(c), Class 3 – New Construction or Conversion of Small Structures and Article 19, Section 15332, Class 32 – Infill Development Projects. The Class 3 exemption applies to projects involving the conversion of existing small commercial buildings (less than 2,500SF) from one use to another, where only minor modifications are made and no expansion of the building footprint occurs. The Class 32 exemption applies to projects that are consistent with the applicable General Plan and zoning designation, occur within city limits on sites less than five acres, and have no value as habitat for endangered, rare, or threatened species. Therefore, the project qualifies for both Class 3 and Class 32 exemptions under CEQA. The project will not result in significant environmental impacts related to traffic, noise, air quality, or public services and requires no further CEQA action. FINDINGS In determining the advisability of issuing a recommendation for adopting amendments to Regarding the application for Conditional Use Permit 25-04, the Planning Commission shall consider the following findings in support of the proposal: 1. The use applied for at the location set forth in the application is properly one for which a Conditional Use Permit is authorized by Chapter 29 of the Municipal Code. The proposed operation of a lounge bar is conditionally permitted pursuant to Section 29-61(c)(1) of the El Centro Municipal Code within the Downtown Commercial (CD) Zone. 2. The proposed use is necessary or desirable for the development of the community, is consistent with the City’s General Plan, and is not detrimental to existing uses or those specifically permitted in the zone. The proposed lounge bar will contribute to the vibrancy and economic vitality of the Downtown Commercial District by activating an underutilized building and providing an additional entertainment and social venue for the community. The project is consistent with the following goals from the General Plan: Land Use Goal 1- Policy 1.8: Achieve and maintain an appropriate balance, variety, and distribution of commercial uses that provides for the retail, business, professional, medical/dental, and other commercial and Page 11 of 37 [PAGE 12] service needs of the City’s residents and will attract customers and visitors from the region and beyond. Prioritize infill commercial development before redesignating non-commercial property to commercial land uses. The proposed operation of a lounge bar in the Downtown Commercial area will utilize an existing property to positively contribute to the downtown atmosphere. The proposed hours will attract customers and visitors to the area at different times of the day further setting the area apart as a lively neighborhood with a mix of entertainment options. Economic Development Goal 7- Policy 7.3: Encourage a mix of different sizes and types of downtown businesses. The proposed operation of a lounge bar in the Downtown Commercial zone supports the expansion of the entertainment industry in this zone. The size and amenities introduce a different type of bar and nightclub to this area. 3. The proposed site is adequate in size and shape to accommodate said use. The existing building provides sufficient space for the proposed use, including a defined bar and lounge area, storage, restrooms, and staff facilities. The property layout allows for proper circulation, emergency exits, and accessibility from Main Street and the rear alley. 4. The site for the proposed use relates properly to streets which are designated to carry the type and quantity of traffic to be generated by the proposed use. The property fronts Main Street, a two-lane collector road, and has secondary access through a public alley. The surrounding roadway network is adequate to accommodate traffic associated with the proposed use. Parking demand will be met through existing public parking lots and on-street spaces available in the downtown area. 5. Conditions as stipulated by the City are necessary to protect the public health, safety, and welfare of the community. Project conditions of approval are incorporated in the resolution attached as Exhibit F and will ensure that the health, safety, and welfare of the community is maintained. NEXT STEPS If the Planning Commission decides in favor of the project, staff will commence with issuing Conditional Use Permit 25-04. The applicant will proceed on submitting building permit applications for interior improvements. The applicant will also secure all required licenses from the Alcohol Beverage Control Board, Imperial County Health Department, and the City of El Centro. Prior to opening staff will inspect the business for compliance. Page 12 of 37 [PAGE 13] RECOMMENDATION & OPTIONS OPTIONS The Planning Commission has the following options when considering action on this matter: 1. Motion to approve Conditional Use Permit 25-04, subject to the adoption of the required findings for the proposal. 2. Motion to disapprove Conditional Use Permit 25-04, subject to the adoption of the required findings against the proposal. 3. Motion to continue the public hearing for further study. STAFF RECOMMENDATION Staff recommends that the Planning Commission open the public hearing and after allowing input, move forward in adopting the Resolution attached as Exhibit F, approving Conditional Use Permit No. 04 for La Plaza Bar. ATTACHMENTS Exhibit A – Project Location Map Exhibit B – Floor Plan Exhibit C – Site Photographs Exhibit D – ABC Liquor License Application Exhibit E – Department Comments Exhibit F – Resolution Page 13 of 37 [PAGE 14] Page 14 of 37 [PAGE 15] "0 '19 24' 2" "0 '19 20' 3 9/16" 15' 6" 24' 2" "4 '41 7' 3" "61/11 7 '7 7' 3" "0 '64 "4 '5 "61/51 5 '3 7' 10" "9 '7 Existing Emergency Exit Only No Public Access E Utility Room 10" 4' 7 5/16" 8' 1 5/16" Main Entrance "61/11 7 '6 7' 3" "61/5 01 '6 "61/9 9 '3 N Cooler Cooler " Storage Room 4 Shelves 6' 1 ADA Restroom Break Room Restroom Surveillance Office 8" Lounge Area Bar R e ce p tio n "0 '41 24' 4" Recycling Container "0 '6 "0 '41 3' 0" Trash Container "0 '6 8' 11" 3' 0" "8 Property Line Existing Fence e c n e F g Rear Outdoor Area n it s ix E Existing Emergency Exit Only No Public Access E Open Space - No Business Use 3' 0" "0 '13 "0 '3 24' 4" "0 '13 3' 0" 11' 10" 9' 6" "0 '3 669 W. Main Street APN 053-104-002-000 Commercial Use - Zoning "C" Under Renovation *No So-Cal Gas hook-up requirement IID Overhead Line Public Use Alley City Water & Sewer Existing Wall Existing Wall E si x all nit W W g n g E ll a E xi sti nit si x g W a ll Existing Wall Existing Wall Existing Wall Existing Wall E lla x W nit si g n ll a W g its ix E nit si x E g W a Existing Wall Existing Wall ll "0 '01 "0 '01 Exhibit B Public Covered Walk-Way (Front Outdoor Area) Main Street Page 15 of 37 [PAGE 16] EXHIBIT C Sidewalk Fronting Project Site Page 16 of 37 [PAGE 17] EXHIBIT C Front of Building Page 17 of 37 [PAGE 18] EXHIBIT C Building Interior (facing entrance) Page 18 of 37 [PAGE 19] EXHIBIT C Back Room (labeled Open Space on Site Plan – see Exhibit B) Page 19 of 37 [PAGE 20] Exhibit D Page 20 of 37 [PAGE 21] EXHIBIT E CITY OF EL CENTRO DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION INTER-OFFICE REVIEW MEMORANDUM DOCUMENT REVIEW TYPE: ☐SPR ☒CUP ☐TPM ☐PM Review Date: November 21st, 2025 TO: Valeria Landeros, Assistant Planner FROM: Jaime Hidalgo, Engineering Technician SUBJECT: Conditional Use Permit 25-04 – La Plaza Bar at 669 W. Main Street ☒ SUBMITTAL STATUS: Submittal has been reviewed. Refer to comments below. ☐ Unacceptable submittal. Missing information. Refer to additional requirements at end. GENERAL COMMENTS ☒ Irrigation, building and fire backflow preventers shall be required and a plan depicting their location is necessary for review and approval by the City Water Department. ☒ Any water, sewer and storm-drain systems onsite shall be maintained by the development and not by the City. Any future tie-ins to the onsite system shall first require a Building Permit for proper inspections. Any future work or maintenance of the onsite utilities shall be performed by contractors properly licensed to do such work. ☐ A sewer pretreatment program will be required. Provide anticipated sewer load to Wastewater department for assessment. ☒ All improvements within the City’s right of way shall be designed and built according to City standards and specifications and submitted for review with: ☒ Encroachment permit application ☐ Reference to Parcel Map name. ☐ Grading permit is required. Approved grading permit shall be obtained prior to building permit issuance. Provide trash enclosure built to city standards. Provide City Trash Service Purveyor (CR&R) approval letter of ☒ trash enclosure sizing prior to issuance of a Grading Permit or Building Permit, whichever comes first. ☒ Other: Refer to Additional Requirements section at end of this document WATER AND SEWER CAPACITY FEES ☐ Water and sewer capacity fees will be assessed prior to building permit being issued based on increased use and/or intensity from historical conditions. ☒ Based on preliminary provided information, no increase in use or intensity from historical use is anticipated and no sewer or water capacity fee will be assessed. Re-evaluation required if use or intensity change. ☒ Other: Refer to Additional Requirements section at end of this document Page 21 of 37 [PAGE 22] GRADING AND EROSION CONTROL ☐ A grading, drainage, and erosion control plans prepared by a licensed civil engineer in the State of California depicting the elevations and slopes for all new site work shall be submitted for review and approval prior to building permit. Plans shall comply with Chapter 22, Article VII “Storm Water Regulations” of the El Centro Ordinance, Chapter 7, Article XIX “Grading Regulations” of the El Centro Ordinance and El Centro Post Construction Best Management Practices supporting said ordinances. Plans shall also ensure compliance with the American with Disability Act (ADA). ☐ Project is over 1 acre and requires a SWPPP in compliance with the State Water Resources Control Board. Submit copy of approved Notice of Intent (NOI) as submitted to the SMARTS system as part of Grading Permit application. ☐ If not already installed, all onsite drainage must flow through storm interceptor system in order to decrease grease and other volatile waste from entering the drainage system. The grading plan shall depict the type and location of the storm interceptor system. ☐ Retention basin, if built, shall comply with City retention basin standard. Retention basin must drain within three days. Retention basin must be equipped with systems to re-route nuisance water if connection point is available in compliance with the Storm Water Ordinance. ☐ A Water Quality Management Plan is to be submitted along with grading permit application prepared by a licensed civil engineer. ☐ Provide stabilized entrance/exit in accordance with best management practices to prevent tracking on city streets for review and approval by city. Proposed work to be shown in improvement plans. ☐ Facility type is required to have an Erosion Control Plan for construction activities. ☐ Other: Refer to Additional Requirements section at end of this document ADA ☒ All sidewalks, driveway approaches, and ADA ramps provided must comply with ADA access standards and City standards. ☒ Provide ADA access from nearest public sidewalk to facility main access. ☒ Other: Refer to Additional Requirements section at end of this document IMPROVEMENTS ☒ Provide improvement plans for all off-site work prepared by a licensed Civil Engineer in the State of California. Plans shall clearly identify all Right-of-Way lines, proposed improvements, elevations, benchmarks, dimensions and material / workmanship specifications as may be required. Provide curb/gutter and sidewalks to city standards on all fronting streets. (see notes below) ☐ ☐ Provide street lighting to city standards on all fronting streets. Page 22 of 37 [PAGE 23] ☐ Construct half width of the streets fronting the site or one lane each direction plus parking lane, whichever is greater to City standards. ☐ Provide fire hydrants to city standards and spacing requirements, if none within 300 feet distance. ☐ Provide sewer and water off-site utility plans for review and approval by this department with encroachment permit application. ☒ Other: Refer to Additional Requirements section at end of this document ADDITIONAL REQUIREMENTS 1. Capacity Fees per Resolution No. 07-100: a. La Plaza Bar (Bar/Nightclub w/o food) ; 1 EDU per each 100 seating capacity. 56 seats / 100 seats = 0.56 EDU b. Based on historical use of store occupancy EDU credit is assessed as follows: Existing Building (Shop, Offices): 2,000 S.F. x 1 EDU / 2,000 S.F. = 1.0 EDU c. Estimated Capacity Fees: 0.56 EDU < 1.0 EDU assessed therefore no additional capacity fees are required at this time. Should additional square footage be constructed, or a change of occupancy be performed, additional capacity fees may be added when Tenant Improvement Building Permits are applied for. Water and Sewer capacities fees shall be paid either through a building permit, a water and sewer connection application, or an encroachment permit. 2. Any severely broken, lifted, or tripping hazard portions of sidewalk, driveways, and/or curb & gutter fronting the proposed project shall be removed and replaced. 3. Per ADA requirements, an ADA accessible pathway shall be provided to the Proposed Development from the Public Right of Way. 4. All improvements within the City’s right of way shall be designed and built according to City standards and specifications and submitted for review with an encroachment permit application. If necessary, provide improvement plans for all off-site work prepared by a licensed Civil Engineer in the State of California. Plans shall clearly identify all Right-of-Way lines, proposed improvements, elevations, benchmarks, dimensions and material / workmanship specifications as may be required. All improvements within the City’s right of way shall be designed and built according to City standards and specifications and submitted for review with an encroachment permit application Respectfully, ________________________________ ___________________________ Jaime Hidalgo Engineering Technician Date Page 23 of 37 [PAGE 24] City of El Centro Interoffice Memorandum Department of Building and Safety To: Valeria Landeros, Assistant Planner From: Frank Soto, Building Official Date: 11/25/2025 Subject: Conditional Use Permit 25-04 Proposal: La Plaza Bar ________________________________________________ 1. A building permit shall be required for any construction and/or demolition. 2. All areas of this new proposed bar shall be accessible to persons with disabilities. 3. All exit doors shall open in the direction of travel and shall be provided with fire exit hardware. 4. The exit leading to the rear of the building shall be delineated with floor markings and shall include the wording “ Exit Route, Do Not Block Or Obstruct.” 5. A business license inspection shall be required before opening for business. 6. Expect additional code requirements or upgrades after the inspection is conducted. Respectfully, Frank soto Page 24 of 37 [PAGE 25] Frank Soto Assistant Community Development Director/ Building Official Page 25 of 37 [PAGE 26] EXHIBIT F PLANNING COMMISSION RESOLUTION NO. 25--- FOR CONDITIONAL USE PERMIT NO. 25-04 WHEREAS, a public hearing was held on the petition for Conditional Use Permit No. 25- 04 at a regular Planning Commission Meeting held on December 09, 2025 in the City Council Chambers at 1275 W. Main Street, El Centro, California; and WHEREAS, the public hearing was advertised according to law; and WHEREAS, the applicant was present and heard; and WHEREAS, no one was present to object to the petition nor were any objections filed with the Commission; and WHEREAS, the proposed operation of a bar is subject to a conditional use permit pursuant to Section 29-61 of the City Code; and WHEREAS, the proposed use is necessary or desirable for the development of the community, is consistent with the objectives of the City’s General Plan, and is not detrimental to the existing uses or the uses specifically permitted in the zone in which the proposed use is to be located; and WHEREAS, the proposed site is adequate in size and shape to accommodate said use; and WHEREAS, the proposal is categorically exempt from formal environmental review pursuant to Article 19, Section 15303(c), Class 3 of the California Environmental Quality Act of 1970, as amended, pertaining to infill development; and WHEREAS, the proposed use will have no significant deleterious effect on the environment; and WHEREAS, the conditions as stipulated by the City are necessary to protect the public health, safety, and welfare of the community; and NOW, THEREFORE, be it resolved that the Planning Commission grants approval of Conditional Use Permit No. 25-04, to allow the operation of a bar in an existing building located at 669 W. Main Street, further identified as APN 053-104-002. GENERAL CONDITIONS 1. The project shall consist of the operation of a lounge bar on property located at 669 W. Main Street, further identified as APN 053-104-002 (project site). 2. The project shall be developed in accordance with the site plan as approved by the Planning Commission. Page 26 of 37 [PAGE 27] EXHIBIT F 3. The bar shall not operate until the applicant receives a City of El Centro business license. 4. Prior to the issuance of a business license, a site inspection shall be conducted by city staff to verify compliance with the conditions of approval, building code requirements, and fire code requirements. 5. Unless otherwise mentioned hereto, conditions of approval shall be satisfactory met prior to the issuance of a business license. 6. The project site shall be maintained in a good, clean, orderly manner, free of any debris or junk materials. 7. The project shall comply with all applicable Federal, State and local codes, ordinances and resolutions. BUILDING DESIGN AND DEVELOPMENT 8. The maximum building occupancy shall be determined by the Building Official. A sign showing the maximum building occupancy shall be posted within the building. 9. All doorways leading to the building exterior shall be kept free of any obstructions. 10. The rear room labeled open space on the site plan shall be delineate with floor marking identifying the path for emergency exit and shall be labeled with the wording “Exit Route, Do Not Block or Obstruct”. 11. All exit doors shall open in the direction of travel and be equipped with code-compliant panic hardware – including the exterior gate providing access to the public alley. 12. Prior to the painting of the building exterior the City must be first notified. The walls, columns, and all exterior building elements are to be in a uniform or complimentary color scheme. Prior to any modifications to the building exterior, the applicant shall submit building elevations, color samples or other exhibits to the Community Development Department to review compliance with Section 29-63 “Commercial Zone Design Standards” of the El Centro City Code. Exterior building colors shall be appropriate to and enhance the architectural style and materials of the structure. Intense primary colors shall be prohibited as the dominant overall color for the building. The color palette chosen shall generally be compatible with the colors of adjacent structures. 13. All new exterior lighting shall be hooded and arranged to shine light away from adjacent properties and streets. 14. Prior to any installation of exterior signage, the operator shall consult with the community development department to determine the necessity of obtaining a building permit and to review the conformance with Chapter 22.1 “Signs” of the El Centro City Code. Page 27 of 37 [PAGE 28] EXHIBIT F 15. Wind feathers, banners or other temporary signage shall not be used as permanent signage or as principal signage. Signage shall comply with Chapter 22.1 – “Signs” of the El Centro City Code. Signage constructed of cloth, canvas, light fabric, cardboard, wallboard and other light materials shall only be used on a temporary basis, not exceeding forty-five (45) days within one year. Wind-feather signs are permitted one (1) per every thirty feet (30’) of street frontage and are not permitted within the public right-of-way. Wind-feathers shall not be mounted on structures. LITTER AND SIDEWALK CONDITIONS 16. The operator shall provide for the cleaning and removal of litter within the adjacent sidewalk on Main Street. The cleaning and removal of litter shall be completed by 8:00 AM the morning after the bar is in operation. 17. The operator shall provide proof of commercial trash collection services at the bar. 18. Trash containers servicing the project site shall be stored and kept from obstructing access through the alleyway. Trash containers shall not be stored or kept within sidewalks, driveways, or public roadways abutting the project site. 19. Any graffiti applied on the building exterior shall be removed within 72 hours after the occurrence. OPERATING RESTRICTIONS 20. The bar shall not operate after 2:00 A.M. 21. Admittance to the bar shall be restricted to patrons 21 years of age or older. SECURITY 22. At minimum, two security personnel shall be present at the bar during operating hours on weekends, of which one security person shall be stationed at the entrance of the building to monitor the entry of patrons, maintain a clear egress, verify identification of patrons, and ensure compliance with entry requirements. 23. An IP base security camera system shall be installed at the facility. 24. The operator shall ensure the orderly queuing of patrons entering the facility do not obstruct the public sidewalk. PASSED AND ADOPTED on December 09, 2025 by the following vote: ROLL CALL: Ayes: Noes: Absent: Abstaining: Page 28 of 37 [PAGE 29] EXHIBIT F CITY OF EL CENTRO PLANNING COMMISSION By_________________________________ Ashley Bertussi, Chairperson ATTEST: APPROVED AS TO FORM: By_________________________________ By__________________________________ Angel Hernandez, AICP Elizabeth L. Martyn, Secretary-Director City Attorney Page 29 of 37 [PAGE 30] PLANNING COMMISSION Item: 3. City Hall Meeting: 12/9/2025 5:30 PM 1275 W. Main Street NEW BUSINESS El Centro, CA 92243 DISCUSSION AND ANY NECESSARY ACTION REGARDING ATTENDANCE AT THE CAL CITIES PLANNING COMMISSIONER'S ACADEMY STAFF REPORT - ACTION ITEM: The League of California Cities (Cal Cities) will host the Planning Commissioner's Academy from March 11th to March 13th, 2026 in Anaheim, California. The Community Development Department was allocated funding for two Planning Commissioners to attend the event. Funding includes travel, hotel, and registration fees for the event. Further information regarding the event may be found on the event webpage at: https://my.calcities.org/Events/Calendar-Of-Events/Meeting-Home- Page?meetingid=%7B7866AF6D-6841-F011-B4CB-7C1E5200E689%7D Staff is requesting that the Planning Commission open the item for discussion and select two members to attend. ATTACHMENTS: None Page 30 of 37 [PAGE 31] PLANNING COMMISSION Item: 4. City Hall Meeting: 12/9/2025 5:30 PM 1275 W. Main Street Category: Presentation El Centro, CA 92243 NON-ACTION INFORMATION ITEMS 2026 PLANNING COMMISSION MEETING CALENDAR STAFF REPORT - INFORMATION ITEM: Please find the 2026 Planning Comissioner Calendar for your referrence. ATTACHMENTS: 1. P lanning Commission Deadlines Page 31 of 37 [PAGE 32] CITY OF EL CENTRO 2026 PLANNING COMMISSION AGENDA DEADLINES Planning Newspaper Planning Commission Commission Clerk Deadline for Public Meeting Dates Deadline Hearing Notices (2nd Tuesday of Every Month at 5:30 p.m.) legals@ivpressonline.com January 13, 2026 January 6, 2026 December 30, 2025 February 10, 2026 February 3, 2026 January 27, 2026 March 10,2026 March 3, 2026 February 24, 2026 April 14, 2026 April 7, 2026 March 31, 2026 May 12, 2026 May 5, 2026 April 28, 2026 June 9, 2026 June 2, 2026 May 26, 2026 July 14, 2026 July 7, 2026 June 30, 2026 August 11, 2026 August 4, 2026 July 28, 2026 September 8, 2026 September 1, 2026 August 25, 2026 October 13, 2026 October 6, 2026 September 29, 2026 November 10, 2026 November 3, 2026 October 27, 2026 December 8, 2026 December 1, 2026 November 24, 2026 Environmental Assessment Committee and Administrative Committee meets the 2nd and 4th Thursday at 9:00 a.m. Page 32 of 37 [PAGE 33] PLANNING COMMISSION Item: 5. City Hall Meeting: 12/9/2025 5:30 PM 1275 W. Main Street Category: Presentation El Centro, CA 92243 NON-ACTION INFORMATION ITEMS COMMUNITY DEVELOPMENT DEPARTMENT REPORT STAFF REPORT - INFORMATION ITEM: Civic Center and Downtown Master Plan –City was awarded a grant in the amount of $217,900 for the preparation of a master plan for the Civic Center and Downtown Commercial zones. The grant agreement was executed in October 2025. Staff are in the process of procuring a consultant. Safety, Open Space/Conservation, Noise Element Update – The contract award is expected to go before the City Council on December 16, 2025. 2025 Building and Fire Code Adoption – 2025 Building and Fire Code was adopted on December 2, 2025. Will be in effect by January 2, 2026. Downtown Fee Waiver Program – Presentation and resolution scheduled for consideration by the City Council on December 16, 2025. Zoning Variance 25-01 — City Council will host a public hearing on December 16, 2025 regarding Zoning Variance 25-01 for the corner cutback on 2779 W. Main St. ATTACHMENTS: 1. A ctive Planning and Zoning Projects Page 33 of 37 [PAGE 34] Planning and Zoning Projects Owner Project name Status Summary Project Type Status Description MyGov ID Staff received TSM Completeness Check comments from the Engineering Division and provided them to the Applicant on Chelsea Apartments at NEC 6th Street and October 2, 2023. Next steps were not CEQA COZ GPA Andrea Montaño Paused 22-000001 Spear Avenue provided during the 30 day period TSM requested by the applicant, and a formal 288 unit apartment complex. Zone Change notice will be issued during the week of from CT to R3. Subdivision of 12.9 acre November 17, 2025 . parcel. TSM 22-03, CEQA 22-02, COZ 22-03, GPA Planned Unit Development for Single This project has been paused by the CEQA COZ CUP Andrea Montaño 22-02, CUP 22-04 Town Center Paused Family Residential and Light Industrial 22-000002 applicant until further notice. GPA TSM Single-Family/Industrial Subdivision Development. Countryside South Subdivision Map Modifications of COA for Countryside South Angel Hernandez Staff is meeting monthly with the applicant. TSM Paused 22-000007 Amendment TSM Approved by City Council on February 4, 2025. Annexation approved by LAFCo on TSM Willow Bend Subdivision Map Andrea Montaño 2/27/2028. Annexation recorded on TSM In Progress Amendment to Conditions of 22-000008 Amendment 5/30/2025. The ICE Study was submitted to Approval of the Willowbend Caltrans for review on August 11, 2025. TSM. Project approved by City Council meeting MND 17-02, GPA 17-02, COZ on 4/4/2023. Annexation approved on Angel Hernandez Annexation CEQA Paused 23-000006 17-02,Dogwood and Villa Annexation 2/27/2024 by LAFCo. Applicant submitted map for review on August 25, 2025. Annexation of 320 Acre parcel Project placed on hold per applicant in Subdivision of 80 acre property to create Angel Hernandez TPM 17-02 ICOE McCabe and Sperber TPM Paused 23-000007 December 2024. two parcels. Applicant was provided with corrections on LLA/LM 23-01 Lot Line Adjustment Dahm 11/20/23. On 9/11/2025 applicant Andrea Montaño LLA/LM Paused 23-000009 1425 Cypress Drive contacted staff and they are waiting on a document to be completed. Adjust lots between two residential parcels As of 12/16/24 applicant has resumed project. Staff is waiting for applicant to LLA/LM 23-03 Maruti Cons. Lot Line provide an updated preliminary title report. Andrea Montaño Adjustment WS Imperial Avenue b/t I-8 and The project manager informed staff on LLA/LM In Progress 23-000021 Danenberg 10/24/25 that the applicants were actively engaging with title holders to proceed with completions of the lot line. Lot line adjustment of parcels. The applicant received the comments on February 13, 2025 for the Tentative Subdivision Map, Specific Plan, and Traffic COZ 23-01, TSM 23-01, SP 23-01 Galey Study. Staff met with the applicants CEQA COZ TSM Andrea Montaño Kennedy Investment Parkview Single Family consultant on 8/14/25 to discuss proposed Paused The Parkview project proposes a Tentative 23-000028 Specific Plan Subdivision 1526 Clark changes and get feedback to complete the Map, Specific Plan, Pre-Zoning and next submittal. Project Manager informed Annexation to allow for subdividing the staff on 10/24/25 that the project is being approximately 26-acre project into 114 lots redesigned. for development with single family homes. Documents were approved by consultant surveyor on 4/2/24 . Staff is awaiting applicant to prepare documents for recording. On 2/12/25 applicant sent an LLA 24-03 LC Engineering Consultants, INC_ email that they are obtaining signatures to Andrea Montaño LLA/LM Paused 24-000006 Hyundai Dealership-2202 Merrill Center Dr. record documents. On 9/11/2025, a representative for the construction project notified staff that they are still awaiting for signatures from the owner. A project inactivity notice will be issued on 11/13/25. Merge two properties into one. 12/4/2025 1 Page 34 of 37 [PAGE 35] Planning and Zoning Projects Owner Project name Status Summary Project Type Status Description MyGov ID An incomplete application notice was provided to the applicant on 6/28/2024. Staff met with the applicant on 7/25/2024 to discuss next steps. As of 6/4/2025 a SPR 24-10 Dubose Design Group, Inc- El resubmittal has not been received. The Andrea Montaño SPR Paused 24-000039 Centro Shopping Center project manager informed staff on New Commercial/Retail Development with 10/1/2025 that there has been no Restaurant Fast Food pads along South of additional communication from the Imperial between Wake & Danenberg Rd. developers. A 30 day notice was issued on 140,358 square feet. Retail and Fast Food 10/2/2025. Buildings 3500 sq. ft. Vacant property that had an approved Staff issued the correction letter for the tentative map that expired Request third review on 9/3/2025. Corrected plans re-approval for 50 single family lots in a R-1 TSM 24-01 Dubose Design Group, Inc._ were submitted on 10/15/25 and are being zoned parcel. Layout is the same as the Andrea Montaño TSM Paused 24-000041 Courtyard Villas Subdivision reviewed for completeness by the previous TM approved, including 2.38 ac. Engineering Division and the Planning Retention Basin and 10.57ac, Park that will Division. be next to an existing park in Desert Village West #5. The applicant received comments on 10/25/2024. The item has been paused by SPR 24-15 DuBose Design Group, LLC_New the applicant. The project manager Andrea Montaño Commercial Development-Corner of informed staff on 10/1/2025 that there has SPR Paused 24-000053 Imperial & Wake (053-807-007) been no additional communication from Retail development with 131,000 square the developers. A 30 day notice was issued feet of building space plus 2 fast food pads on 10/2/2025. totaling 7,500 square feet. The site plan review letter was provided to the applicant on 1/9/25 and needs to be SPR 24-18 Akbar Zadeh_Self resubmitted. The Engineering Division Andrea Montaño SPR Paused 24-000071 Storage_044-220-110 rejected the resubmitted plans and a notice Self Storage: 2 buildings: 104 & 375 square of incompletion was mailed out on feet, 1500 square feet office, 34 parking, 10/30/25. and 29 covered RV parking. Staff reached out to applicant on June 4, SPR 25-04 Ivonn Carlos_Storage Yard_2099 Angel Hernandez 2025. Staff and applicant reviewing building 25-000009 Fairfield Ave. code compliance. SPR Paused Storage Yard Staff sent Letter of Incompleteness to applicant on 4/22/25. On 9/30/25 the second submittal review was provided to LLA 25-01 Lot Merger_3716 S. Dogwood the applicant by the Engineering Division. Andrea Montaño LLA/LM Paused 25-000014 Ave. Staff received all formal signatures and will begin drafting the legal notices. This is expected to be completed on November Merging two parcels together 054-360-056 19, 2025. and 054-360-057 A site plan correction letter was issued on 04/16/2025. On 10/01/2025, the applicant confirmed they are preparing a resubmittal and submitting fees for the Air Quality Andrea Montaño Study. Staff provided the applicant with the Biological Site Assessment quote. The CUP 25-01 Ventura Transfer applicant is preparing a check to begin Company_Freight Yard_605 N 3rd St. environmental studies currently required. CUP Paused Expansion of freight yard. 25-000023 Staff sent Letter of Incompleteness to applicant on 5/8/25. As of 9/12/2025 the Andrea Montaño applicant is still preparing corrections for Merge lot to upgrade existing parking lot, LLA 25-02 In-N-Out Burgers_Lot the LLA. A project inactivity notice will be new improvements for the expansion of Merger_2390 S. 4th St. issued on 11/13/25. LLA/LM Paused existing drive-thru lane. 25-000026 CUP 25-03 The Potter's House Place of worship, services twice a week. Project was approved by Planning Andrea Montaño Church_Worship Services_401 W. Main CUP Done Every Sunday at 11am and 6:30pm. Midweek 25-000034 Commission on November 17, 2025. Street Currently about 30 members. 12/4/2025 2 Page 35 of 37 [PAGE 36] Planning and Zoning Projects Owner Project name Status Summary Project Type Status Description MyGov ID Letter of Incompleteness Sent 9/18. Corrections received 10/3. Sent Additional Corrections 10/10. Followed up via email Valeria Landeros 10/16. In Person meeting 11/7. CUP In Progress Bar/Lounge in previous retail location. 25-000044 Department comments due 11/25. CUP 25-04 Peraza Plaza_Bar-Lounge_669 Scheduled to go to Planning Commission W. Main Street 12/9. Staff report complete 11/21. The variance was approved by the Planning Commission, for the front yard setback, on 10/14/25 and will be submitted to the City Andrea Montaño Zoning Variance Done New masonry wall and footing Foundation 25-000047 Council as a consent item. The western ZV 25-01 ROC Construction_New Masonry corner cutback is anticipated to be Wall_2779 W. Main St. reviewed at the 11/17/25 meeting. SPR 25-16 Lopez Air_New Determination Letter was mailed on New Warehouse at existing warehouse and Valeria Landeros Warehouse_1150 N. 4th St November 18, 2025. SPR Done office building location. 25-000050 TUP 25-18 Luxury Fadez,LLC_Barber Andrea Montaño Expo_1482 S. Imperial Ave. Approval letter was send. TUP Done Barber Expo on November 2, 2025 25-000051 COZ 25-01 SPR 25-20 Toma & Saco El Valeria Landeros Centro_Apartment Complex_1438 & 1448 Letter of incompleteness sent 11/24. COZ SPR In Progress Construction of 20-unit apartment complex. G25-000056 Woodward Ave. SPR 25-17 Juan Ortiz_Coffee Shop_626 W. Determination Letter send on November Valeria Landeros State St. 14, 2025. SPR Done Build a coffee shop 1,172 sq. ft. 25-000052 SPR 25-18 Fernando Abell_Commercial Received updated site plan on November Proposed 10-unit commercial strip for retail Valeria Landeros SPR In Progress 25-000053 Strip Center_1865 Adams Ave. 18, 2025. and office use. 11,225 sq. ft. The project proposes a store selling Determination Letter was send on Andrea Montaño SPR 25-19 Home Depo_Furniture SPR Done furniture, cabinetry vanities and other 25-000054 November 19, 2025. Store_3751 Dogwood Rd. home related products. SPR 25-14 Sergio Hernandez_4plex Determination Letter was mailed on Proposed construction of a two-story Valeria Landeros SPR Done 25-000041 building_315 W. Orange November 18, 2025. wood-frame duplex building with two detach Coffee Shop Within the existing church Scheduled to go to City Council 12/16. Staff building. Fronting onto South Waterman & Valeria Landeros ZOTA In Progress 25-000055 ZOTA 25-01 Shandi Jones_ Coffee Shop_450 report complete 11/21. the Northwest corner of Waterman & S. Waterman Ave. Orange Ave. TPM 25-01 Jorge Pacheco_Split Parcel_875 one parcel to be subdivided into three Andrea Montaño Staff is reviewing the application TPM In Progress 25-000057 S. Glenwood Dr. parcels. Verification for 054-530-005, 054-530-002, ZVL 25-07 Verification Letter for 3451 S. Valeria Landeros Letter sent 11/10. ZVL Done 054-530-003, 054-530-004, 054-530-042, 25-000058 Dogwood Ave. 054-530-038 The applicant was notified at project submittal on November 10, 2025 that the application would be considered TPM 25-02 Venking,LLC_New 49- Condominium Units- parcel map waiver Andrea Montaño incomplete as it is missing the justification TPM In Progress 25-000059 Condominiums_Waterman Avenue for tentative map. for parcel map waiver, the Project Information Form, and the Environmental Information Form. TUP 25-19 Sonia Gil_Toy Drive_950 N. Valeria Landeros Approval Letter was send on 12/02/2025. TUP Done 3rd Annual Toy Drive from Local Car Club 25-000060 Imperial Ave. Construction of a new fueling canopy with 6 new dispensers. Interior and exterior of SPR 25-21 Fred Cohen_Travel Center the existing C-Store tenant improvement, Valeria Landeros Staff is reviewing application SPR In Progress 25-000061 Improvements_550 Wake Ave. new exterior drive-thru lane for quick service food. New parking spaces and addition of landscaping. TUP 25-20 Francisco Duarte_Frankys Hot Hot Dog Cart operating on private property Andrea Montaño Staff is reviewing application TUP In Progress 25-000062 Dogs_705 4th Street at 705 S. 4th street (letty's Casita) CUP 25-05 Ernesto Vega_Event Hall_1698 300-person event hall, new building with Valeria Landeros Staff is reviewing application CUP In Progress 25-000063 Main Street 100 total parking spaces. SPR 25-22 Duggins Construction_Burlington New 30,000 square feet retail store and site Andrea Montaño Staff is reviewing application SPR In Progress 25-000064 Store_2430 Cottonwood St. improvements 12/4/2025 3 Page 36 of 37 [PAGE 37] Planning and Zoning Projects Owner Project name Status Summary Project Type Status Description MyGov ID Zoning verification Letter to seek: zoning ZVL 25-08 Verification Letter for 3351 S. compliance, adjacent property designations Andrea Montaño Staff is reviewing the application. ZVL In Progress 25-000065 Dogwood Ave. and uses, code violations and change of ownership. SPR 25-23 Duggins Construction_Metal New 55,590 sq. ft. metal structure and site Valeria Landeros Staff is reviewing the application. SPR In Progress 25-000066 Structure_105 W. Commercial Ave. improvements for Peri & Sons Packing. LLA 25-04 LC Enginerring_Lot Merger_290 Lots are being requested to be merged to Valeria Landeros Solano Ave. Letter of Incompleteness sent 10/16. LLA/LM Paused become a legal lot 25-000048 12/4/2025 4 Page 37 of 37